Excavated site prepared for concrete

Excavation · Joliet & Chicagoland

Every good slab starts below the slab.

Excavation, grading, and base preparation for concrete projects across Joliet and Chicagoland, for homes and businesses. The same crew that digs it pours it, so nothing gets lost between trades.

For
Homes · Businesses
Covers
Dig-out · Grading · Base prep
Your crew
One crew from dig to finish.

What it covers

The work under the work.

Most of what makes concrete last happens before the pour.

Dig-out

Old concrete, soil, and unsuitable material come out to the depth the new work needs.

Grading

The site is shaped so water runs where it should, away from buildings and off the slab.

Base preparation

Soft spots are dug out and replaced with compacted gravel or crushed rock, so the slab sits on an even base.

Utility marking

Before any digging, JULIE marks the public utility lines. Illinois law requires whoever digs to notify JULIE at least 3 days ahead.

Source: JULIE

Drainage

Grading and base work are planned around where water goes, so it doesn't pool against the house or under the slab.

Haul-away

Spoil and old material leave the site, so it's ready for forms the same visit.

How it runs

Dig once. Dig right.

The steps are the same whether it's a driveway or a parking lot.

  1. 01

    Walk the site

    We look at access, drainage, and what's coming out, then talk through the plan.

  2. 02

    Lines marked

    JULIE marks public utilities before the dig. Private lines like sprinklers aren't marked, so point them out.

    Source: JULIE

  3. 03

    Dig out

    Old material and soil come out to depth.

  4. 04

    Grade

    The site is shaped for drainage and the finished height of the new work.

  5. 05

    Build the base

    Compacted gravel or crushed rock goes down in an even layer, ready for forms.

One crew from dig to finish, so the base and the pour are planned together.

The standard

What a proper dig looks like.

General guidance from industry and state sources. Useful whether you call us or not.

3 days

Before digging

Illinois law requires whoever digs to notify JULIE at least 3 days before digging.

Source: JULIE

Private

Lines JULIE won't mark

Sprinklers, private lighting, sewer and septic lines, pools, and power to a detached garage aren't marked. Point them out before the dig.

Source: JULIE

Permit

Before the work

In Joliet, driveways, aprons, sidewalks, and patios need a permit with a plat of survey, even same-size replacements.

Even

Base under the slab

Soft spots are dug out and replaced with compacted gravel or crushed rock, so the slab sits on an even base.

FAQ

Excavation questions, answered.

815-836-1828

7 days a week

  • Whoever does the digging. Illinois law requires them to notify JULIE at least 3 days ahead, not the property owner or the company the work is for.

    Source: JULIE

Get started

Let's walk the site.

Request a free quote and we'll look at access, drainage, and what's coming out, then plan the dig and the pour together. Prefer to talk? Call 815-836-1828, 7 days a week.

Free quotes, 7 days a week.

Serving Greater Chicagoland

7 days a week