Concrete curb and gutter for property managers, developers, and general contractors across Joliet and Chicagoland. One crew from grading to the last joint, working 7 days a week to keep your project moving.
What it does
IDOT's design manual lists what a curb is for. These are the jobs you'll notice.
The gutter controls drainage, carrying runoff along the edge of the pavement.
Source: IDOT manual
A clean, finished line that shows where the pavement ends and guides traffic along it.
Source: IDOT manual
A raised line that separates vehicles from pedestrians.
Source: IDOT manual
Compare
IDOT's curb codes start with one of two letters. Here's what each one tells you.
| Barrier (B) | Mountable (M) | |
|---|---|---|
| The face | Vertical | Sloping |
| Heights in IDOT's standard | 6 or 9 in. | 2, 4, or 6 in. |
| Read it like this | B-6.12: a 6 in. curb with a 12 in. gutter | M-4.24: a 4 in. curb with a 24 in. gutter |
Illustrative, not to scale
Barrier (B)
Illustrative, not to scale
Mountable (M)
Sources: IDOT manual · IDOT Standard 606001
On streets designed for 45 mph or less, either type can be used, so your plans or your town's detail decide. Not sure which yours calls for? We'll go over the plans at your free quote visit.
How we build it
A curb only works if it's on line and on grade. Here's the order.
The profile, the joints, and the concrete all come from your plans or your town's standard detail.
Excavated and graded, then set on an aggregate base. New Lenox's detail calls for 4 in. of crushed aggregate.
Source: Village of New Lenox
Lines and grades are set so the gutter carries water to the drains.
Poured and finished to the profile by the same crew that graded it.
Sawed 2 in. deep 4 to 24 hours after the pour, then sealed. IDOT's standard keeps them 15 ft apart or less.
Source: IDOT Standard 606001
Cured before it takes traffic, then kept free of deicers for its first year.
Source: NRMCA
One crew from the grade to the last joint.
The standard
From IDOT's standard, Will County's code, and one neighboring village's detail. Ask any contractor which detail they're building to.
Will County's subdivision rules require Type B-6.12 curb and gutter, built to IDOT standards.
Source: Will County Code
Contraction joints match the adjacent concrete pavement and never exceed 15 ft.
Source: IDOT Standard 606001
Contraction joints are sawed 2 in. deep 4 to 24 hours after the pour, then sealed.
Source: IDOT Standard 606001
New Lenox's detail calls for at least 3,500 psi in 14 days, tested with cylinders from every day's pour.
Source: Village of New Lenox
Plan ahead
Towns set their own numbers. IDOT caps contraction joints at 15 ft; New Lenox's detail allows up to 20.
Source: Village of New Lenox
IDOT's standard lists 17 barrier and mountable profiles. Confirm which one your plans call for before the first pour.
Source: IDOT Standard 606001
Where driveways, sidewalks, and paths reach the road, Will County's rules have the curb depressed or cut to IDOT standards.
Source: Will County Code
Gutters carry salty runoff. For severe exposure, NRMCA calls for 6–7% air, and at least 4,000 psi where deicers are used.
Source: NRMCA
It's IDOT's shorthand. B means barrier, a curb with a vertical face. The 6 is the curb height in inches, and the 12 is the gutter width in inches.
Source: IDOT manual
A barrier curb has a vertical face, and a mountable curb has a sloping one. On streets designed for 45 mph or less, either can be used, so your plans or your town's detail decide.
Source: IDOT manual
Under IDOT's standard, contraction joints match the adjacent concrete pavement, never more than 15 ft apart. They're sawed 2 in. deep 4 to 24 hours after the pour, then sealed.
Source: IDOT Standard 606001
It depends on the detail. New Lenox's calls for 3/4 in. expansion joints:
Two 2 ft dowels go in at each expansion joint and wherever new curb meets old.
Source: Village of New Lenox
Under Will County's subdivision rules, it's required in every nonresidential subdivision, in residential ones where lots average less than 120 ft wide at the front, and where slopes exceed 5%. The required type is B-6.12.
Source: Will County Code
Keep deicers off it for the first year, and never use ammonium nitrate or ammonium sulfate.
Source: PACA
We work 7 days a week, which gives more room to schedule curb around everything else on site.

Get started
Request a free quote and we'll go over the plans, the detail your town or engineer calls for, and the schedule. Prefer to talk? Call 815-836-1828, 7 days a week.
Free quotes, 7 days a week.